Target systems look alike in photographs and differ in the figures. How fast the face appears, how far the remote reaches and how hits are counted decide what training you can run. This checklist sets out the figures to write down, with the Star INXS Multi-Function Pop-Up Target as the main example.
What a good specification does
A good specification states what the target must do in an exercise. Write the movements, the times and the distances as figures. Do not write a brand name or a model number.
For each figure, say how it will be tested. Expose time is measured with a stopwatch on the range. Wind stability needs a wind speed. Remote range needs a distance and a clear line of sight.
Figures to write into the specification
| Line item | What to ask for | Example: Multi-Function Pop-Up Target |
|---|---|---|
| Movements | Each movement the target must make | Pop-up (0-90°), slicing and rotation on the central axis |
| Expose / hide time | Maximum time to appear and to disappear | 2 s or less |
| Exposure and hits | Range of exposure times, and hits before the target hides | Programmable, 1 s to 2 min; hold-up mode; hits before hide programmable |
| Wind stability | Wind speed at which the face must stay steady | No shake or bend up to 25 km/h |
| Handheld remote | Wireless range and display | Wireless to 100 m (extendable on wire); backlit graphical LCD and keypad; rechargeable |
| Range control | Distance from the control room and number of targets run together | Up to 600 m from the range PC (extendable); 7 targets together or one by one; 8-channel bench console |
| Exercises | The drills the system must run | React-on-hit turn-away, snapshot, timed |
| Hit monitoring | Sensor type and what is recorded | Acoustic hit sensor; hits shown, stored and printable |
| Night firing | Target lighting and how it is switched | Dimmable moonlight-white illumination, switched from the remote |
| Target faces | Figure types and material | Fig 11, Fig 12, Rubia, Hostage A / B on robust acrylic |
| Weight and protection | Maximum weight, and how the mechanism is protected | 50 kg or less, complete with accessories; steel target box behind a 2 m gabion butt wall |
| Power and temperature | Supply, backup and operating temperature | 220-240 V AC with high / low cut-off; 2.5 kVA generator option; -20 °C to +60 °C |
| Rise-and-fall target | Vertical-lift targets for a butt gallery, if needed | Single-Function Pop-Up Target: vertical rise and fall on twin guide rails; timed exposure or fall on hit; 220-240 V AC or battery |
| Moving target | Track, speeds, direction and what the carriage carries | Moving Target System: steel trolley track, 400 kg static load; slow / medium / fast; bidirectional; carries the multi-function target box |
Proof to ask every bidder for
- OEM authorisation if the bidder is not the manufacturer.
- Technical compliance statement that answers every line of your specification, line by line.
- Demonstration or trial on a range: expose time against a stopwatch, remote range at the stated distance, and hit counting with live rounds.
- ISO certificates for the manufacturer, with their scope and validity.
- Warranty and AMC terms in writing, with what is covered.
- Training plan for range staff: who trains, how many people, and where.
- Spares list with target faces, hit sensors, motors and batteries.
- Make in India local-content declaration, as your tender requires.
Common mistakes
- Copying one vendor's brochure. Write the times and distances you need, not a model name.
- Leaving out test conditions. A time or a range with no test method cannot be checked at acceptance.
- Forgetting protection. Say who builds the butt wall or cover that shields the mechanism.
- Forgetting power on the range. State whether mains power reaches the target line.
- Forgetting training and spares. Target faces are consumables. Ask for a quantity in the bid.
Next steps
For the full process see Buying through GeM and tenders. Our Tender & GeM desk provides OEM authorisations, technical compliance statements, detailed spec sheets and budgetary quotes for your requirement. To see the targets, read the Multi-Function Pop-Up Target, Single-Function Pop-Up Target and Moving Target System pages.